patching...
Welcome back, Patch Blogger!

Road Work in Shrewsbury

The following roads will be resurfaced through June.

 
0 of 0
Road work is being done around town.
Photos (1)

Photos

The following road work will be taking place through June in Shrewsbury.

Expect some delays while traveling the following roads:

  • ARCH STREET  (South Street to town line)
  • CROSS STREET (from Prospect Street to North Street)
  • GREEN STREET  (Route 20 to town line)
  • HILL STREET  (Boylston Street to Prospect Street)
  • KNOWLTON AVENUE  (Grafton Street to Wesleyan Terrace)
  • MUNICIPAL DRIVE  (Grafton Street to Wesleyan Terrace)
  • p/o SOUTH STREET  (Route 20 to town line)
  • WALNUT STREET  (Main Circle to Boston Turnpike)   
  • WESLEYAN STREET  (Grafton Street to Maple Avenue)
  • WESLEYAN TERRACE  (Wesleyan Street to Municipal Drive)

For more information, contact the Shrewsbury Highway Department.

Related Topics: Road Work 2012 and Shrewsbury Highway Department

Leave a comment